fr / en

Renovating your bathroom

A bathroom plays out over a few square metres, but it calls for many decisions: where each fitting goes, what gets tiled and what gets painted, the tile layout, the light, the sockets. Here are the ideas, techniques and points of attention that make for a calm building site, a foretaste of working with an architect.

Ideas and design

Reversing the swing of a door can free up space without major work on the wall.

Start with the plan

In our project in Bertem, a 2.40m by 2.10m bathroom, redone in the same place as before. Everything came down to circulation, layout and light.

starting point
Option 1
Option 2
The built option in axonometric view: 60×120cm rectified tiles in two rows, 7cm low wall, vertical window
In Sterrebeek, the plan of the renovated bathroom.
In Kraainem, a bathroom: marble-effect tiles, glazed shower, wall-hung WC

Tiling only where water splashes keeps the investment down: the shower, a splashback at the basin. The rest is painted.

To tile, or not

Tiles mainly do two things: resist water where it splashes, and clean easily. On their own they do not make the wall watertight: waterproofing goes under the tiles, as a membrane or a coating suited to the substrate. A gypsum-based substrate always gets a membrane where water splashes directly.

Elsewhere, nothing requires tiles. You can place tiles in the strategic spots and switch to other finishes: a paint made for damp rooms, a lime or clay plaster, polished concrete or microcement. Each has its own application and maintenance conditions, to be checked in the manufacturer’s data sheet. Gypsum, air lime and clay plasters do not like moisture: Buildwise advises against them on walls often exposed to splashing, such as a shower, unless they are waterproofed. A heated and ventilated private bathroom is not, however, considered a wet room. Polished concrete does not, on its own, make a shower watertight.

Fully tiled
Half-height wainscot, shower full height
Shower and splashback tiled, the rest painted
Shower tiled, lime plaster elsewhere
Tiles kept to a minimum: the shower behind its glass panel, a splashback at the basin, the floor throughout

What each option costs per square metre is in the price benchmarks further down.

Without tiles: plasters

The same wall, and sometimes the floors, can be finished differently. Polished concrete or microcement, often known by a brand name such as mortex, goes on in thin coats on walls and floors alike. Tadelakt, a lime plaster polished with a stone and fed with black soap, is used in hammams. Clay and lime breathe and regulate the room’s humidity. None is watertight on its own in a shower: each needs its complete system, or a membrane underneath, according to the manufacturer’s data sheet. Clay and air lime stay out of the splash zones.

Polished concrete, microcement
Tadelakt
Clay plaster
Lime plaster

Not every layout takes the same work: a diagonal or a herringbone means more cuts and more time, and that shows in the price.

The tile layout

The tile layout is the drawing of the tiles: their size, their colours, their direction, their offset, where you start and where the cuts fall. With the same tile, the room can look taller, wider, calmer or livelier. It is drawn wall by wall, before ordering.

Small tiles are in fashion, but they multiply the joints: more surface to maintain, more cuts and more laying. A large format, 60×60 or 60×120 rectified, reduces the joints and cleans faster. That was the choice in Sterrebeek and Bertem. Small formats still make sense as a touch: a niche, a splashback, a shower floor.

Straight lay
Vertical stack
Chevron
Herringbone
Basketweave
Checkerboard
Diagonal
Mosaic
Border band
Tartan
Wainscot, coloured joint
Small format, dark joint
Vertical stripes
Tiles and dots
Diagonal checkerboard
In plan

The threshold

Between two rooms on the same floor level, you can change the layout and mark the passage differently, with or without finishing profiles. Here, a walnut parquet effect on one side, a band of white squares at the threshold, then light brown squares with dark joints.

In elevation: the same level on both sides

A dark joint reveals the pattern, a joint in the same tone erases it. A light joint, unless it is epoxy, can dull over time.

Colours and joints

On a simple base of 20 × 20 squares, the joint colour changes everything: light or in the same tone, it erases the pattern, dark or coloured, it reveals it.

Dark joint, grey tile
Yellow joint, blue tile
White joint

Joint in the same tone
Grey joint
Dark grey joint


Types of joints: cement, epoxy and sealant
  • Cement joint: the most common and the cheapest, but porous: it gets dirty and weathers over time.
  • Epoxy joint: harder and almost watertight, it resists stains and cleaning products. More expensive and trickier to apply, it suits showers and tiled tops well.
  • Flexible joint (silicone sealant): in the corners and around the shower tray or bath, where materials move. It needs maintaining and replacing.
In a showroom: finishing profiles and joints chosen in the same shade
In Kraainem, the profile finishes the tiles at the edge of the wall

A shelf aligned with a tile or a joint: drawn beforehand, it falls into place.

The details

This is often where a bathroom is won: the glass panel held in a profile, a soap dish the size of a tile, a switch centred on the grid, a built-in bench in the shower, a coloured shelf fixed in the joints. These details are drawn before the works, otherwise they do not happen.

Shower panel clamped in a U-profile
One-tile soap dish, switch centred on the grid
Built-in tiled bench in the shower
Glass blocks to let the light through
Two shelves: one the size of a tile, the other a metal profile set right in a joint
Stained wood cabinet, visible grain

A wall-hung cabinet frees the floor: cleaning is simpler.

Basins and cabinets

Countertop, built into the top, wall-hung, on a slim frame, or under a built-in tiled ledge: the basin decides the height of the top, the storage below and the cleaning. With a countertop basin, the tap comes out of the wall or the cabinet. A wall-hung cabinet or basin frees the floor, which makes maintenance easier. Mind the load-bearing capacity of your wall. Not every wall can carry a basin with only the fixings supplied, sometimes a support such as legs is still needed. 

Countertop, walnut cabinet
Built into the top, blue cabinet
Wall-hung
On a frame
Built-in tiled ledge
The built-in ledge in axonometric view

The spotlight between the mirror and the face, not above the head.

Light

A spotlight placed right above the head casts shadows on the face. Placed between the mirror and the face, or on each side of the mirror, it lights the face from the front. At the mirror, a neutral white of 4000 to 4500K renders colours accurately. For the bath, a warm white of 2700 to 3000K, for atmosphere.

In Sterrebeek, two spotlights per mirror cross their beams, an LED strip runs around the frame
The same wall, built, with the two spotlights in the ceiling

Our rule: where they are needed, within reach, but out of sight.

Sockets and switches

First the style, chosen with the taps and light fittings. Then the position: you reach for the switch as you walk in, the socket where you do your hair and shave. They are decided before the tiling, moving them afterwards means opening the wall.

Rocker, push-button, toggle, key

Radiators and towel rails

The radiator can become an object: column, a ladder for drying towels, a flat panel, a bent tube, or tucked into a niche. Its height, width and colour are yours to choose, often from the full RAL range or metal finishes, to match the colour of the joints, a wall or the tap finishes. 

 

The shower

A shower tray set on the finished floor means stepping over a step. A level-access shower is built flush with the floor: you walk in without a step, and a wall-mounted bench with a grab rail lets you shower seated. For a walk-in tiled shower, the space for the drain must be planned and the slope is formed in the screed. The same goes for a tray: the drain position is prepared, and where the drain sits in the tray differs from one model to another.

In Sterrebeek, the tiled shower, with a niche built into the wall
The mood of the drawing translates into a shower corner with 15×15cm tiles in a straight lay, light epoxy joints, a full-length bench, three niches and a recessed shower head. The channel drain has a tiled cover plate, framed by a grey recessed joint. 
Shower columns, overhead showers and hand showers
Shower channel drains
Niches to build into the thickness of the wall
Concealed taps: the body goes into the wall before the tiling

From site to finishes

Each wall drawn before the quote, then followed during site visits.

In Sterrebeek, the plan in the centre and each wall unfolded around it
The walls stripped bare
The new water pipes run through the floor
Large-format tiles laid, water outlets waiting

How we help

A bathroom is a succession of choices: some can be anticipated, others are made on the spot. We support you when you need it, so that you choose with full knowledge rather than putting up with your choices, or their absence.

À la carte

For a specific question, without a full commission.

advice on your situation, comparison of contractors’ quotes, formalities, drawing of a tile layout or an elevation

Design

To draw the room before asking for prices.

plan and elevations, tile layout wall by wall, light, sockets, fittings, interior architecture and choice of materials

Full commission

When the works go beyond the bathroom, or need a permit.

design and application, tendering to contractors, site supervision

We do not answer technical questions by phone or e-mail without having looked at the situation: every bathroom has its own particularities and constraints.

Costs item by item

They give an order of magnitude, excl. VAT: the condition of the installation and the range chosen make them vary. 

An example

A 2m by 3m bathroom renovation: level-access shower with glass panel, wall-hung basin, wall-hung WC, towel rail, floor and walls tiled in the shower and painted elsewhere.

The bathroom estimate
Demolition and removal1000€
Plumbing, connecting the fittingsfrom 1000€
Screed and waterproofing500–1500€
Floor and shower tiling (varies with tile price)50–130€/m²
Painting walls and ceiling30–50€/m²
Shower (not concealed)from 1 000€
Basin and wall-hung WCfrom 1500€
Towel railfrom 450€
Ventilation with sensorsfrom 750€
Electrics, lightingfrom 400€
Total excl. VAT8500-10,000€
Some other price benchmarks

Demolition, screed and waterproofing

Removing wall tilesapprox. 30€/m²
Removing the screed and floor tiles40–50€/m²
Cement screed, 6 to 8cm30–40€/m²
Waterproofing under tiles, floor30–40€/m²
Waterproofing under tiles, wall30–40€/m²

Finishes

Floor tiles 60×6050–60€/m²
Wall tiles 10×10 to 30×30100–130€/m²
Paint, primer and 2 coats 30–50€/m²
Lime plaster50–60€/m²
Clay plaster70–80€/m²

Shower and bath

Walk-in tiled shower, drain included980–1 170€/unit
Shower tray570–1000€/unit
Glass shower panel870–1 500€/unit
Thermostatic mixer and hand shower300–400€/unit
Thermostatic mixer and overhead shower850–1 000€/unit
Concealed taps870–1 500€/unit
Acrylic bath700–1000€/unit

Basin, WC and fittings

Wall-hung basin440–1000€/unit
Wall-hung WC850–1100€/unit
Floor-standing WC550–700€/unit
Towel railfrom 450€/unit
Extractor fan with humidistatfrom 750€/unit
Recessed LED spotlight IP65approx. 70€/unit

The membrane kit around the shower tray is often forgotten: plan for it.

Waterproofing

Waterproofing goes under the tiles, on the floor and on exposed walls, with a tape in every corner, as a semi-rigid or liquid membrane. Before tiling, the plumber checks his pipes for leaks. Note that the perimeter membrane is often forgotten when fitting a shower tray or a bath, so it is best to order the kit in advance. 

Waterproofing under the tiles, corner tape between wall and floor
Waterproofing and uncoupling membranes, seen in a showroom

Slope and drainage

For water to run off, the slope of the tiled floor exceeds 10mm per metre. In a shower, the tiles must also limit the risk of slipping barefoot. The traps recommended in the technical documentation keep a water depth of at least 50mm: that is what stops odours coming back up.

Level-access shower: slope in the screed, waterproofing under the tiles

Never block the gap under the door.

Ventilation

A bathroom is ventilated with an extraction of at least 50m³/h to the outside. Air comes in from the neighbouring rooms through a transfer opening, for example a gap of at least 70cm² under the door. This is the EPB requirement for new homes and a starting benchmark in renovation.

Our advice: ventilation that runs continuously all day, with at least a humidity sensor (performance can drop over time). If possible, choose a model with, or add, a VOC and CO₂ or presence sensor.

Air comes in through the gap under the door and leaves through the extract vent

Electrics and IP rating

The electrical regulations divide the room into zones around the water. All circuits go through a residual current device of 30mA maximum. A light fitting is also chosen on the basis of its IP rating:

  • IP65 ceiling spotlight above the shower, the safest choice for all zones.
  • IP44 advised everywhere else in the room (IP21 tolerated outside a certain perimeter).
Zones around a shower and a bath, schematic sections

Noise

Hearing water running through the pipes from the bedrooms is not necessarily pleasant. The Belgian acoustic standard for housing sets maximum levels for noise from sanitary installations. To get close to it, an engineering firm can study the routing of the waste pipes, their fixing and their casing.

Heat and condensation

A healthy, heated and well-ventilated bathroom dries out. On a cold or uninsulated wall, vapour condenses and mould follows. Insulating that wall from the inside can help, but it calls for a study (thermal bridges, condition of the structure, water permeability, rising damp, etc).

Standards and recommendations

The rules of good practice to remember, one diagram each.

Under the tiles, a membrane where water splashes. Tiles alone are not watertight. 
The shower floor falls by more than 1cm per metre towards the drain. 
At least 50mm of water in the trap to block odours. 
Lime, clay and gypsum do not like splashing: in the shower, tiles and membrane. 

Maintenance

A bathroom remains sensitive: regular maintenance protects it: 

Regularly

  • Wall tiles: clean water, with a mildly alkaline cleaner or a non-acidic detergent if needed.
  • Floor tiles: water and Marseille soap, or steam.
  • Natural stone: neutral soap, never an acidic product.
  • Taps: check they work and clean the filters.
  • Traps: check they are watertight and remove deposits.

Without delay

  • Maintain the flexible joints around and in the shower.
  • Extract vents: clean regularly, ideally every 3 months.
  • Do not block the opening under the door or the air grille.

References

A few products

Geberit

Wall-hung WC frames.

Schlüter

Waterproofing and uncoupling membranes under tiles.

Mapei

Finishing profiles and joints in matching shades.

Winckelmans

Porcelain tiles and mosaics for floors and walls.

Decor Walther

Bathroom accessories and light fittings.

Your project

Want to take your bathroom project further, or another room?

Contact us through our online form